September 2018 | 2018-09-01 | Alpine Combined | 653.57 | 62 | NRP | see rules |
August 2018 | 2018-08-02 | Alpine Combined | 653.57 | 62 | NRP | see rules |
July 2018 | 2018-07-03 | Alpine Combined | 653.57 | 61 | NRP | see rules |
June 2018 | 2018-06-02 | Alpine Combined | 653.57 | 62 | NRP | see rules |
May 2018 | 2018-05-03 | Alpine Combined | 653.57 | 64 | NRP | see rules |
April 2018 | 2018-04-01 | Alpine Combined | 653.57 | 66 | NRP | see rules |
March 2018 - 19 March List | 2018-03-20 | Alpine Combined | 653.57 | 65 | NRP | see rules |
February 2018 - February 19 List | 2018-02-20 | Alpine Combined | 653.57 | 60 | NRP | see rules |
February 2018 | 2018-02-02 | Alpine Combined | 653.57 | 60 | NRP | see rules |
January 2018 | 2018-01-06 | Alpine Combined | 653.57 | 60 | NRP | see rules |
December 2017 - 23 December List | 2017-12-24 | Alpine Combined | 653.57 | 60 | NRP | see rules |
December 2017 - 10 December List | 2017-12-11 | Alpine Combined | 653.57 | 60 | NRP | see rules |
December 2017 | 2017-12-02 | Alpine Combined | 653.57 | 53 | NRP | see rules |
September 2017 | 2017-09-02 | Alpine Combined | 653.57 | 57 | NRP | see rules |
August 2017 | 2017-08-02 | Alpine Combined | 653.57 | 57 | NRP | see rules |
July 2017 | 2017-07-04 | Alpine Combined | 653.57 | 58 | NRP | see rules |
June 2017 | 2017-06-02 | Alpine Combined | 653.57 | 59 | NRP | see rules |
May 2017 | 2017-05-02 | Alpine Combined | 553.57 | 58 | SRP | = 503.58 + max SRP |
April 2017 | 2017-04-04 | Alpine Combined | 553.57 | 60 | SRP | = 503.58 + max SRP |
March 2017 | 2017-03-21 | Alpine Combined | 553.57 | 56 | SRP | = 503.58 + max SRP |
February 2017 - 20 Feb list | 2017-02-21 | Alpine Combined | 553.57 | 56 | SRP | = 503.58 + max SRP |
September 2016 | 2016-09-02 | Alpine Combined | 553.57 | 65 | SRP | = 503.58 + max SRP |
August 2016 | 2016-08-02 | Alpine Combined | 553.57 | 65 | SRP | = 503.58 + max SRP |
July 2016 | 2016-07-02 | Alpine Combined | 553.57 | 63 | SRP | = 503.58 + max SRP |
June 2016 | 2016-06-02 | Alpine Combined | 553.57 | 65 | SRP | = 503.58 + max SRP |
May 2016 | 2016-05-01 | Alpine Combined | 553.57 | 65 | SRP | = 503.58 + max SRP |
April 2016 | 2016-04-01 | Alpine Combined | 553.57 | 67 | SRP | = 503.58 + max SRP |
March 2016 | 2016-03-14 | Alpine Combined | 553.57 | 67 | SRP | = 503.58 + max SRP |
February 2016 - 20 February list | 2016-02-20 | Alpine Combined | 553.57 | 65 | SRP | = 503.58 + max SRP |
February 2016 - 8 February list | 2016-02-06 | Alpine Combined | 706.41 | 65 | NRP | see rules |
January 2016 | 2016-01-07 | Alpine Combined | 706.41 | 65 | NRP | see rules |
December 2015 - 22 December list | 2015-12-22 | Alpine Combined | 706.41 | 65 | NRP | see rules |
December 2015 - 9 December list | 2015-12-09 | Alpine Combined | 706.41 | 65 | NRP | see rules |
November 2015 | 2015-11-05 | Alpine Combined | 706.41 | 57 | NRP | see rules |
September 2014 | 2014-09-02 | Alpine Combined | 606.41 | 65 | SRP | = 556.42 + max SRP |
August 2014 | 2014-08-02 | Alpine Combined | 606.41 | 64 | SRP | = 556.42 + max SRP |
July 2014 | 2014-07-11 | Alpine Combined | 606.41 | 64 | SRP | = 556.42 + max SRP |
June 2014 | 2014-06-04 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
May 2014 | 2014-05-03 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
April 2014 | 2014-04-09 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
March 2014 - 17 March list | 2014-03-18 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
February 2014 - 17 Feb list | 2014-02-18 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
February 2014 - 1st Feb List | 2014-02-01 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
January 2014 - 21 Jan List | 2014-01-22 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
January 2014 | 2014-01-02 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
2nd December 2013 | 2013-12-23 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
December 2013 | 2013-12-02 | Alpine Combined | 606.41 | | SRP | = 556.42 + max SRP |
November 2013 | 2013-11-02 | Alpine Combined | 789.82 | | NRP | see rules |
September 2013 | 2013-09-07 | Alpine Combined | 789.82 | | NRP | see rules |
August 2013 | 2013-08-01 | Alpine Combined | 789.82 | | NRP | see rules |
July 2013 | 2013-07-01 | Alpine Combined | 789.82 | | NRP | see rules |
June 2013 | 2013-06-01 | Alpine Combined | 789.82 | | NRP | see rules |
May 2013 | 2013-05-02 | Alpine Combined | 789.82 | | NRP | see rules |
April 2013 | 2013-04-02 | Alpine Combined | 789.82 | | NRP | see rules |
March 2013 | 2013-03-02 | Alpine Combined | 789.82 | | NRP | see rules |
2nd list Februar 2013 | 2013-02-09 | Alpine Combined | 789.82 | | NRP | see rules |
February 2013 | 2013-02-01 | Alpine Combined | 789.82 | | NRP | see rules |
January 2013 | 2013-01-07 | Alpine Combined | 789.82 | | NRP | see rules |
2nd list December 2012 | 2012-12-16 | Alpine Combined | 789.82 | | NRP | see rules |
September 2012 | 2012-09-01 | Alpine Combined | 789.82 | | NRP | see rules |
August 2012 | 2012-08-01 | Alpine Combined | 789.82 | | NRP | see rules |
July 2012 | 2012-07-01 | Alpine Combined | 789.82 | | NRP | see rules |
June 2012 | 2012-06-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
May 2012 | 2012-05-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
April 2012 | 2012-04-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
March 2012 | 2012-03-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
February 2012 | 2012-02-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
January 2012 | 2012-01-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
December 2011 | 2011-12-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
September 2011 | 2011-09-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
August 2011 | 2011-08-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
July 2011 | 2011-07-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
June 2011 | 2011-06-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
May 2011 | 2011-05-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
April 2011 | 2011-04-01 | Alpine Combined | 689.82 | | SRP | = 639.82 + max SRP |
September 2018 | 2018-09-01 | Downhill | 553.81 | 53 | NRP | see rules |
August 2018 | 2018-08-02 | Downhill | 553.81 | 53 | NRP | see rules |
July 2018 | 2018-07-03 | Downhill | 553.81 | 52 | NRP | see rules |
June 2018 | 2018-06-02 | Downhill | 553.81 | 54 | NRP | see rules |
May 2018 | 2018-05-03 | Downhill | 515.39 | 52 | | = (514.22 + 516.57) / 2 |
April 2018 | 2018-04-01 | Downhill | 515.39 | 52 | | = (514.22 + 516.57) / 2 |
March 2018 - 19 March List | 2018-03-20 | Downhill | 515.39 | 52 | | = (514.22 + 516.57) / 2 |
February 2018 - February 19 List | 2018-02-20 | Downhill | 515.39 | 50 | | = (514.22 + 516.57) / 2 |
February 2018 | 2018-02-02 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
January 2018 | 2018-01-06 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
December 2017 - 23 December List | 2017-12-24 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
December 2017 - 10 December List | 2017-12-11 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
December 2017 | 2017-12-02 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
September 2017 | 2017-09-02 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
August 2017 | 2017-08-02 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
July 2017 | 2017-07-04 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
June 2017 | 2017-06-02 | Downhill | 515.39 | 47 | | = (514.22 + 516.57) / 2 |
May 2017 | 2017-05-02 | Downhill | 453.82 | 50 | | = (448.93 + 458.71) / 2 |
April 2017 | 2017-04-04 | Downhill | 453.82 | 50 | | = (448.93 + 458.71) / 2 |
March 2017 | 2017-03-21 | Downhill | 453.82 | 50 | | = (448.93 + 458.71) / 2 |
February 2017 - 20 Feb list | 2017-02-21 | Downhill | 453.82 | 49 | | = (448.93 + 458.71) / 2 |
September 2016 | 2016-09-02 | Downhill | 453.82 | 43 | | = (448.93 + 458.71) / 2 |
August 2016 | 2016-08-02 | Downhill | 453.82 | 43 | | = (448.93 + 458.71) / 2 |
July 2016 | 2016-07-02 | Downhill | 453.82 | 43 | | = (448.93 + 458.71) / 2 |
June 2016 | 2016-06-02 | Downhill | 453.82 | 43 | | = (448.93 + 458.71) / 2 |
May 2016 | 2016-05-01 | Downhill | 453.82 | 43 | | = (448.93 + 458.71) / 2 |
April 2016 | 2016-04-01 | Downhill | 453.82 | 44 | | = (448.93 + 458.71) / 2 |
March 2016 | 2016-03-14 | Downhill | 453.82 | 44 | | = (448.93 + 458.71) / 2 |
February 2016 - 20 February list | 2016-02-20 | Downhill | 453.82 | 43 | | = (448.93 + 458.71) / 2 |
February 2016 - 8 February list | 2016-02-06 | Downhill | 616.39 | 42 | NRP | see rules |
January 2016 | 2016-01-07 | Downhill | 616.39 | 35 | NRP | see rules |
December 2015 - 22 December list | 2015-12-22 | Downhill | 616.39 | 35 | NRP | see rules |
December 2015 - 9 December list | 2015-12-09 | Downhill | 616.39 | 35 | NRP | see rules |
November 2015 | 2015-11-05 | Downhill | 616.39 | 35 | NRP | see rules |
September 2014 | 2014-09-02 | Downhill | 616.39 | 40 | NRP | see rules |
August 2014 | 2014-08-02 | Downhill | 616.39 | 40 | NRP | see rules |
July 2014 | 2014-07-11 | Downhill | 616.39 | 40 | NRP | see rules |
June 2014 | 2014-06-04 | Downhill | 616.39 | | NRP | see rules |
May 2014 | 2014-05-03 | Downhill | 616.39 | | NRP | see rules |
April 2014 | 2014-04-09 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
March 2014 - 17 March list | 2014-03-18 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
February 2014 - 17 Feb list | 2014-02-18 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
February 2014 - 1st Feb List | 2014-02-01 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
January 2014 - 21 Jan List | 2014-01-22 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
January 2014 | 2014-01-02 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
2nd December 2013 | 2013-12-23 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
December 2013 | 2013-12-02 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
November 2013 | 2013-11-02 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
September 2013 | 2013-09-07 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
August 2013 | 2013-08-01 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
July 2013 | 2013-07-01 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
June 2013 | 2013-06-01 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
May 2013 | 2013-05-02 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
April 2013 | 2013-04-02 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
March 2013 | 2013-03-02 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
2nd list Februar 2013 | 2013-02-09 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
February 2013 | 2013-02-01 | Downhill | 516.39 | | | = (504.91 + 527.87) / 2 |
January 2013 | 2013-01-07 | Downhill | 611.94 | | | |
2nd list December 2012 | 2012-12-16 | Downhill | 611.94 | | | |
September 2012 | 2012-09-01 | Downhill | 611.94 | | | |
August 2012 | 2012-08-01 | Downhill | 611.94 | | | |
July 2012 | 2012-07-01 | Downhill | 611.94 | | | |
June 2012 | 2012-06-01 | Downhill | 611.94 | | | |
May 2012 | 2012-05-01 | Downhill | 611.94 | | | |
April 2012 | 2012-04-01 | Downhill | 611.94 | | | |
March 2012 | 2012-03-01 | Downhill | 700.14 | | | |
February 2012 | 2012-02-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
January 2012 | 2012-01-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
December 2011 | 2011-12-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
September 2011 | 2011-09-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
August 2011 | 2011-08-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
July 2011 | 2011-07-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
June 2011 | 2011-06-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
May 2011 | 2011-05-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
April 2011 | 2011-04-01 | Downhill | 907.56 | | SRP | = 857.56 + max SRP |
September 2018 | 2018-09-01 | Giant Slalom | 302.73 | 78 | | = (297.67 + 307.80) / 2 |
August 2018 | 2018-08-02 | Giant Slalom | 302.73 | 78 | | = (297.67 + 307.80) / 2 |
July 2018 | 2018-07-03 | Giant Slalom | 302.73 | 77 | | = (297.67 + 307.80) / 2 |
June 2018 | 2018-06-02 | Giant Slalom | 253.51 | 71 | | = (238.09 + 268.93) / 2 |
May 2018 | 2018-05-03 | Giant Slalom | 253.51 | 72 | | = (238.09 + 268.93) / 2 |
April 2018 | 2018-04-01 | Giant Slalom | 253.51 | 72 | | = (238.09 + 268.93) / 2 |
March 2018 - 19 March List | 2018-03-20 | Giant Slalom | 253.51 | 70 | | = (238.09 + 268.93) / 2 |
February 2018 - February 19 List | 2018-02-20 | Giant Slalom | 253.51 | 70 | | = (238.09 + 268.93) / 2 |
February 2018 | 2018-02-02 | Giant Slalom | 253.51 | 69 | | = (238.09 + 268.93) / 2 |
January 2018 | 2018-01-06 | Giant Slalom | 253.51 | 69 | | = (238.09 + 268.93) / 2 |
December 2017 - 23 December List | 2017-12-24 | Giant Slalom | 253.51 | 67 | | = (238.09 + 268.93) / 2 |
December 2017 - 10 December List | 2017-12-11 | Giant Slalom | 253.51 | 67 | | = (238.09 + 268.93) / 2 |
December 2017 | 2017-12-02 | Giant Slalom | 253.51 | 67 | | = (238.09 + 268.93) / 2 |
September 2017 | 2017-09-02 | Giant Slalom | 253.51 | 70 | | = (238.09 + 268.93) / 2 |
August 2017 | 2017-08-02 | Giant Slalom | 253.51 | 70 | | = (238.09 + 268.93) / 2 |
July 2017 | 2017-07-04 | Giant Slalom | 253.51 | 71 | | = (238.09 + 268.93) / 2 |
June 2017 | 2017-06-02 | Giant Slalom | 253.51 | 75 | | = (238.09 + 268.93) / 2 |
May 2017 | 2017-05-02 | Giant Slalom | 253.51 | 75 | | = (238.09 + 268.93) / 2 |
April 2017 | 2017-04-04 | Giant Slalom | 253.51 | 75 | | = (238.09 + 268.93) / 2 |
March 2017 | 2017-03-21 | Giant Slalom | 322.88 | 73 | SRP | = 272.88 + max SRP |
February 2017 - 20 Feb list | 2017-02-21 | Giant Slalom | 315.22 | 74 | | = (272.88 + 357.56) / 2 |
September 2016 | 2016-09-02 | Giant Slalom | 315.22 | 83 | | = (272.88 + 357.56) / 2 |
August 2016 | 2016-08-02 | Giant Slalom | 315.22 | 83 | | = (272.88 + 357.56) / 2 |
July 2016 | 2016-07-02 | Giant Slalom | 315.22 | 83 | | = (272.88 + 357.56) / 2 |
June 2016 | 2016-06-02 | Giant Slalom | 315.22 | 85 | | = (272.88 + 357.56) / 2 |
May 2016 | 2016-05-01 | Giant Slalom | 315.22 | 85 | | = (272.88 + 357.56) / 2 |
April 2016 | 2016-04-01 | Giant Slalom | 315.22 | 86 | | = (272.88 + 357.56) / 2 |
March 2016 | 2016-03-14 | Giant Slalom | 376.76 | 91 | | = (357.56 + 395.97) / 2 |
February 2016 - 20 February list | 2016-02-20 | Giant Slalom | 376.76 | 90 | | = (357.56 + 395.97) / 2 |
February 2016 - 8 February list | 2016-02-06 | Giant Slalom | 376.76 | 90 | | = (357.56 + 395.97) / 2 |
January 2016 | 2016-01-07 | Giant Slalom | 376.76 | 86 | | = (357.56 + 395.97) / 2 |
December 2015 - 22 December list | 2015-12-22 | Giant Slalom | 376.76 | 86 | | = (357.56 + 395.97) / 2 |
December 2015 - 9 December list | 2015-12-09 | Giant Slalom | 445.97 | 81 | SRP | = 395.97 + max SRP |
November 2015 | 2015-11-05 | Giant Slalom | 356.13 | 70 | NRP | see rules |
September 2014 | 2014-09-02 | Giant Slalom | 256.13 | 87 | | = (244.24 + 268.03) / 2 |
August 2014 | 2014-08-02 | Giant Slalom | 256.13 | 86 | | = (244.24 + 268.03) / 2 |
July 2014 | 2014-07-11 | Giant Slalom | 256.13 | 86 | | = (244.24 + 268.03) / 2 |
June 2014 | 2014-06-04 | Giant Slalom | 256.13 | | | = (244.24 + 268.03) / 2 |
May 2014 | 2014-05-03 | Giant Slalom | 256.13 | | | = (244.24 + 268.03) / 2 |
April 2014 | 2014-04-09 | Giant Slalom | 256.13 | | | = (244.24 + 268.03) / 2 |
March 2014 - 17 March list | 2014-03-18 | Giant Slalom | 256.13 | | | = (244.24 + 268.03) / 2 |
February 2014 - 17 Feb list | 2014-02-18 | Giant Slalom | 256.13 | | | = (244.24 + 268.03) / 2 |
February 2014 - 1st Feb List | 2014-02-01 | Giant Slalom | 256.13 | | | = (244.24 + 268.03) / 2 |
January 2014 - 21 Jan List | 2014-01-22 | Giant Slalom | 256.13 | | | = (244.24 + 268.03) / 2 |
January 2014 | 2014-01-02 | Giant Slalom | 333.91 | | | = (328.38 + 339.44) / 2 |
2nd December 2013 | 2013-12-23 | Giant Slalom | 333.91 | | | = (328.38 + 339.44) / 2 |
December 2013 | 2013-12-02 | Giant Slalom | 387.09 | | | = (366.05 + 408.14) / 2 |
November 2013 | 2013-11-02 | Giant Slalom | 387.09 | | | = (366.05 + 408.14) / 2 |
September 2013 | 2013-09-07 | Giant Slalom | 387.09 | | | = (366.05 + 408.14) / 2 |
August 2013 | 2013-08-01 | Giant Slalom | 387.09 | | | = (366.05 + 408.14) / 2 |
July 2013 | 2013-07-01 | Giant Slalom | 387.09 | | | = (366.05 + 408.14) / 2 |
June 2013 | 2013-06-01 | Giant Slalom | 387.09 | | | = (366.05 + 408.14) / 2 |
May 2013 | 2013-05-02 | Giant Slalom | 387.09 | | | = (366.05 + 408.14) / 2 |
April 2013 | 2013-04-02 | Giant Slalom | 387.09 | | | = (366.05 + 408.14) / 2 |
March 2013 | 2013-03-02 | Giant Slalom | 410.87 | | | |
2nd list Februar 2013 | 2013-02-09 | Giant Slalom | 410.87 | | | |
February 2013 | 2013-02-01 | Giant Slalom | 410.87 | | | |
January 2013 | 2013-01-07 | Giant Slalom | 410.87 | | | |
2nd list December 2012 | 2012-12-16 | Giant Slalom | 415.79 | | | |
September 2012 | 2012-09-01 | Giant Slalom | 423.49 | | | |
August 2012 | 2012-08-01 | Giant Slalom | 423.49 | | | |
July 2012 | 2012-07-01 | Giant Slalom | 423.49 | | | |
June 2012 | 2012-06-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
May 2012 | 2012-05-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
April 2012 | 2012-04-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
March 2012 | 2012-03-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
February 2012 | 2012-02-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
January 2012 | 2012-01-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
December 2011 | 2011-12-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
September 2011 | 2011-09-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
August 2011 | 2011-08-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
July 2011 | 2011-07-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
June 2011 | 2011-06-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
May 2011 | 2011-05-01 | Giant Slalom | 378.06 | | | = (364.07 + 392.05) / 2 |
April 2011 | 2011-04-01 | Giant Slalom | 378.06 | | | = (392.05 + 364.07) / 2 |
September 2018 | 2018-09-01 | Slalom | 281.30 | 73 | | = (281.19 + 281.42) / 2 |
August 2018 | 2018-08-02 | Slalom | 281.30 | 73 | | = (281.19 + 281.42) / 2 |
July 2018 | 2018-07-03 | Slalom | 281.30 | 73 | | = (281.19 + 281.42) / 2 |
June 2018 | 2018-06-02 | Slalom | 281.30 | 74 | | = (281.19 + 281.42) / 2 |
May 2018 | 2018-05-03 | Slalom | 281.30 | 76 | | = (281.19 + 281.42) / 2 |
April 2018 | 2018-04-01 | Slalom | 281.30 | 77 | | = (281.19 + 281.42) / 2 |
March 2018 - 19 March List | 2018-03-20 | Slalom | 298.15 | 76 | | = (281.19 + 315.12) / 2 |
February 2018 - February 19 List | 2018-02-20 | Slalom | 298.15 | 76 | | = (281.19 + 315.12) / 2 |
February 2018 | 2018-02-02 | Slalom | 298.15 | 76 | | = (281.19 + 315.12) / 2 |
January 2018 | 2018-01-06 | Slalom | 328.20 | 80 | | = (315.12 + 341.28) / 2 |
December 2017 - 23 December List | 2017-12-24 | Slalom | 328.20 | 80 | | = (315.12 + 341.28) / 2 |
December 2017 - 10 December List | 2017-12-11 | Slalom | 328.20 | 80 | | = (315.12 + 341.28) / 2 |
December 2017 | 2017-12-02 | Slalom | 328.20 | 80 | | = (315.12 + 341.28) / 2 |
September 2017 | 2017-09-02 | Slalom | 347.77 | 87 | | = (341.28 + 354.26) / 2 |
August 2017 | 2017-08-02 | Slalom | 347.77 | 87 | | = (341.28 + 354.26) / 2 |
July 2017 | 2017-07-04 | Slalom | 347.77 | 87 | | = (341.28 + 354.26) / 2 |
June 2017 | 2017-06-02 | Slalom | 347.77 | 86 | | = (341.28 + 354.26) / 2 |
May 2017 | 2017-05-02 | Slalom | 347.77 | 87 | | = (341.28 + 354.26) / 2 |
April 2017 | 2017-04-04 | Slalom | 347.77 | 87 | | = (341.28 + 354.26) / 2 |
March 2017 | 2017-03-21 | Slalom | 353.31 | 84 | | = (341.28 + 365.35) / 2 |
February 2017 - 20 Feb list | 2017-02-21 | Slalom | 337.73 | 81 | | = (334.18 + 341.28) / 2 |
September 2016 | 2016-09-02 | Slalom | 384.18 | 92 | SRP | = 334.18 + max SRP |
August 2016 | 2016-08-02 | Slalom | 384.18 | 92 | SRP | = 334.18 + max SRP |
July 2016 | 2016-07-02 | Slalom | 384.18 | 92 | SRP | = 334.18 + max SRP |
June 2016 | 2016-06-02 | Slalom | 384.18 | 94 | SRP | = 334.18 + max SRP |
May 2016 | 2016-05-01 | Slalom | 384.18 | 94 | SRP | = 334.18 + max SRP |
April 2016 | 2016-04-01 | Slalom | 384.18 | 94 | SRP | = 334.18 + max SRP |
March 2016 | 2016-03-14 | Slalom | 384.18 | 93 | SRP | = 334.18 + max SRP |
February 2016 - 20 February list | 2016-02-20 | Slalom | 384.18 | 91 | SRP | = 334.18 + max SRP |
February 2016 - 8 February list | 2016-02-06 | Slalom | 384.18 | 91 | SRP | = 334.18 + max SRP |
January 2016 | 2016-01-07 | Slalom | 384.18 | 91 | SRP | = 334.18 + max SRP |
December 2015 - 22 December list | 2015-12-22 | Slalom | 384.18 | 89 | SRP | = 334.18 + max SRP |
December 2015 - 9 December list | 2015-12-09 | Slalom | 376.18 | 84 | NRP | see rules |
November 2015 | 2015-11-05 | Slalom | 376.18 | 76 | NRP | see rules |
September 2014 | 2014-09-02 | Slalom | 276.18 | 94 | | = (252.82 + 299.55) / 2 |
August 2014 | 2014-08-02 | Slalom | 276.18 | 94 | | = (252.82 + 299.55) / 2 |
July 2014 | 2014-07-11 | Slalom | 276.18 | 94 | | = (252.82 + 299.55) / 2 |
June 2014 | 2014-06-04 | Slalom | 276.18 | | | = (252.82 + 299.55) / 2 |
May 2014 | 2014-05-03 | Slalom | 276.18 | | | = (252.82 + 299.55) / 2 |
April 2014 | 2014-04-09 | Slalom | 276.18 | | | = (252.82 + 299.55) / 2 |
March 2014 - 17 March list | 2014-03-18 | Slalom | 276.18 | | | = (252.82 + 299.55) / 2 |
February 2014 - 17 Feb list | 2014-02-18 | Slalom | 270.90 | | | = (252.82 + 288.99) / 2 |
February 2014 - 1st Feb List | 2014-02-01 | Slalom | 270.90 | | | = (252.82 + 288.99) / 2 |
January 2014 - 21 Jan List | 2014-01-22 | Slalom | 270.90 | | | = (252.82 + 288.99) / 2 |
January 2014 | 2014-01-02 | Slalom | 270.90 | | | = (252.82 + 288.99) / 2 |
2nd December 2013 | 2013-12-23 | Slalom | 270.90 | | | = (252.82 + 288.99) / 2 |
December 2013 | 2013-12-02 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
November 2013 | 2013-11-02 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
September 2013 | 2013-09-07 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
August 2013 | 2013-08-01 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
July 2013 | 2013-07-01 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
June 2013 | 2013-06-01 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
May 2013 | 2013-05-02 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
April 2013 | 2013-04-02 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
March 2013 | 2013-03-02 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
2nd list Februar 2013 | 2013-02-09 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
February 2013 | 2013-02-01 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
January 2013 | 2013-01-07 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
2nd list December 2012 | 2012-12-16 | Slalom | 307.39 | | | = (288.99 + 325.81) / 2 |
September 2012 | 2012-09-01 | Slalom | 569.91 | | | |
August 2012 | 2012-08-01 | Slalom | 569.91 | | | |
July 2012 | 2012-07-01 | Slalom | 569.91 | | | |
June 2012 | 2012-06-01 | Slalom | 529.02 | | | |
May 2012 | 2012-05-01 | Slalom | 529.02 | | | |
April 2012 | 2012-04-01 | Slalom | 529.02 | | | |
March 2012 | 2012-03-01 | Slalom | 529.02 | | | |
February 2012 | 2012-02-01 | Slalom | 529.02 | | | |
January 2012 | 2012-01-01 | Slalom | 529.02 | | | |
December 2011 | 2011-12-01 | Slalom | 615.84 | | SRP | = 565.84 + max SRP |
September 2011 | 2011-09-01 | Slalom | 615.84 | | SRP | = 565.84 + max SRP |
August 2011 | 2011-08-01 | Slalom | 615.84 | | SRP | = 565.84 + max SRP |
July 2011 | 2011-07-01 | Slalom | 615.84 | | SRP | = 565.84 + max SRP |
June 2011 | 2011-06-01 | Slalom | 615.84 | | SRP | = 565.84 + max SRP |
May 2011 | 2011-05-01 | Slalom | 615.84 | | SRP | = 565.84 + max SRP |
April 2011 | 2011-04-01 | Slalom | 615.84 | | SRP | = 565.84 + max SRP |
September 2018 | 2018-09-01 | Super-G | 410.60 | 75 | | = (399.93 + 421.28) / 2 |
August 2018 | 2018-08-02 | Super-G | 410.60 | 75 | | = (399.93 + 421.28) / 2 |
July 2018 | 2018-07-03 | Super-G | 410.60 | 75 | | = (399.93 + 421.28) / 2 |
June 2018 | 2018-06-02 | Super-G | 410.60 | 74 | | = (399.93 + 421.28) / 2 |
May 2018 | 2018-05-03 | Super-G | 410.60 | 74 | | = (399.93 + 421.28) / 2 |
April 2018 | 2018-04-01 | Super-G | 410.60 | 75 | | = (399.93 + 421.28) / 2 |
March 2018 - 19 March List | 2018-03-20 | Super-G | 410.60 | 75 | | = (399.93 + 421.28) / 2 |
February 2018 - February 19 List | 2018-02-20 | Super-G | 410.60 | 74 | | = (399.93 + 421.28) / 2 |
February 2018 | 2018-02-02 | Super-G | 410.60 | 73 | | = (399.93 + 421.28) / 2 |
January 2018 | 2018-01-06 | Super-G | 436.35 | 72 | | = (421.28 + 451.43) / 2 |
December 2017 - 23 December List | 2017-12-24 | Super-G | 466.06 | 71 | | = (451.43 + 480.70) / 2 |
December 2017 - 10 December List | 2017-12-11 | Super-G | 466.06 | 71 | | = (451.43 + 480.70) / 2 |
December 2017 | 2017-12-02 | Super-G | 466.06 | 62 | | = (451.43 + 480.70) / 2 |
September 2017 | 2017-09-02 | Super-G | 476.78 | 67 | NRP | see rules |
August 2017 | 2017-08-02 | Super-G | 476.78 | 67 | NRP | see rules |
July 2017 | 2017-07-04 | Super-G | 476.78 | 68 | NRP | see rules |
June 2017 | 2017-06-02 | Super-G | 476.78 | 67 | NRP | see rules |
May 2017 | 2017-05-02 | Super-G | 376.78 | 66 | | = (364.30 + 389.26) / 2 |
April 2017 | 2017-04-04 | Super-G | 376.78 | 67 | | = (364.30 + 389.26) / 2 |
March 2017 | 2017-03-21 | Super-G | 376.78 | 67 | | = (364.30 + 389.26) / 2 |
February 2017 - 20 Feb list | 2017-02-21 | Super-G | 376.78 | 68 | | = (364.30 + 389.26) / 2 |
September 2016 | 2016-09-02 | Super-G | 376.78 | 72 | | = (364.30 + 389.26) / 2 |
August 2016 | 2016-08-02 | Super-G | 376.78 | 72 | | = (364.30 + 389.26) / 2 |
July 2016 | 2016-07-02 | Super-G | 376.78 | 72 | | = (364.30 + 389.26) / 2 |
June 2016 | 2016-06-02 | Super-G | 376.78 | 74 | | = (364.30 + 389.26) / 2 |
May 2016 | 2016-05-01 | Super-G | 376.78 | 74 | | = (364.30 + 389.26) / 2 |
April 2016 | 2016-04-01 | Super-G | 376.78 | 75 | | = (364.30 + 389.26) / 2 |
March 2016 | 2016-03-14 | Super-G | 376.78 | 71 | | = (364.30 + 389.26) / 2 |
February 2016 - 20 February list | 2016-02-20 | Super-G | 376.78 | 72 | | = (364.30 + 389.26) / 2 |
February 2016 - 8 February list | 2016-02-06 | Super-G | 447.49 | 73 | | = (418.03 + 476.95) / 2 |
January 2016 | 2016-01-07 | Super-G | 447.49 | 73 | | = (418.03 + 476.95) / 2 |
December 2015 - 22 December list | 2015-12-22 | Super-G | 447.49 | 73 | | = (418.03 + 476.95) / 2 |
December 2015 - 9 December list | 2015-12-09 | Super-G | 447.49 | 67 | | = (418.03 + 476.95) / 2 |
November 2015 | 2015-11-05 | Super-G | 558.58 | 61 | NRP | see rules |
September 2014 | 2014-09-02 | Super-G | 458.59 | 74 | | = (426.78 + 490.41) / 2 |
August 2014 | 2014-08-02 | Super-G | 458.59 | 73 | | = (426.78 + 490.41) / 2 |
July 2014 | 2014-07-11 | Super-G | 458.59 | 73 | | = (426.78 + 490.41) / 2 |
June 2014 | 2014-06-04 | Super-G | 458.59 | | | = (426.78 + 490.41) / 2 |
May 2014 | 2014-05-03 | Super-G | 458.59 | | | = (426.78 + 490.41) / 2 |
April 2014 | 2014-04-09 | Super-G | 430.24 | | | = (426.78 + 433.70) / 2 |
March 2014 - 17 March list | 2014-03-18 | Super-G | 430.24 | | | = (426.78 + 433.70) / 2 |
February 2014 - 17 Feb list | 2014-02-18 | Super-G | 430.24 | | | = (426.78 + 433.70) / 2 |
February 2014 - 1st Feb List | 2014-02-01 | Super-G | 430.24 | | | = (426.78 + 433.70) / 2 |
January 2014 - 21 Jan List | 2014-01-22 | Super-G | 430.24 | | | = (426.78 + 433.70) / 2 |
January 2014 | 2014-01-02 | Super-G | 430.24 | | | = (426.78 + 433.70) / 2 |
2nd December 2013 | 2013-12-23 | Super-G | 430.24 | | | = (426.78 + 433.70) / 2 |
December 2013 | 2013-12-02 | Super-G | 445.34 | | | = (433.70 + 456.99) / 2 |
November 2013 | 2013-11-02 | Super-G | 445.34 | | | = (433.70 + 456.99) / 2 |
September 2013 | 2013-09-07 | Super-G | 445.34 | | | = (433.70 + 456.99) / 2 |
August 2013 | 2013-08-01 | Super-G | 445.34 | | | = (433.70 + 456.99) / 2 |
July 2013 | 2013-07-01 | Super-G | 445.34 | | | = (433.70 + 456.99) / 2 |
June 2013 | 2013-06-01 | Super-G | 420.35 | | | |
May 2013 | 2013-05-02 | Super-G | 420.35 | | | |
April 2013 | 2013-04-02 | Super-G | 420.35 | | | |
March 2013 | 2013-03-02 | Super-G | 420.35 | | | |
2nd list Februar 2013 | 2013-02-09 | Super-G | 420.35 | | | |
February 2013 | 2013-02-01 | Super-G | 420.35 | | | |
January 2013 | 2013-01-07 | Super-G | 430.92 | | | |
2nd list December 2012 | 2012-12-16 | Super-G | 430.92 | | | |
September 2012 | 2012-09-01 | Super-G | 430.92 | | | |
August 2012 | 2012-08-01 | Super-G | 430.92 | | | |
July 2012 | 2012-07-01 | Super-G | 430.92 | | | |
June 2012 | 2012-06-01 | Super-G | 430.92 | | | |
May 2012 | 2012-05-01 | Super-G | 430.92 | | | |
April 2012 | 2012-04-01 | Super-G | 430.92 | | | |
March 2012 | 2012-03-01 | Super-G | 509.43 | | | |
February 2012 | 2012-02-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |
January 2012 | 2012-01-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |
December 2011 | 2011-12-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |
September 2011 | 2011-09-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |
August 2011 | 2011-08-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |
July 2011 | 2011-07-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |
June 2011 | 2011-06-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |
May 2011 | 2011-05-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |
April 2011 | 2011-04-01 | Super-G | 557.54 | | | = (459.22 + 655.88) / 2 |